Major Road Closure Alert: A95 Trunk Road Shut for Event on August 23-24, 2025

Major Road Closure Alert: A95 Trunk Road Shut for Event on August 23-24, 2025

18 August 2025 at 7:15 am (Europe/London)

Attention motorists and residents: The Scottish Government has announced a temporary closure and restrictions on the A95 Trunk Road between Granish and Grantown-On-Spey. This is to facilitate a special event, ensuring both safety and ease for participants and spectators.

Key Details:

  • Closure Period: From 23rd to 24th August 2025.
  • Affected Stretch: The A95 Trunk Road from its junction with the M9/A9 to the B970 near Grantown-on-Spey, spanning about 21 kilometers.

Restrictions Include:

  • Complete Road Closure: No vehicles will be allowed on the specified stretch during this period, unless exempted.
  • Prohibited Turns:
    • No right turns from the southbound A95 onto B9153 Carrbridge Road.
    • No right turns from A939 onto the southbound A95.

Exemptions:

  • Emergency vehicles (fire brigade, ambulance, police, coastguard).
  • Vehicles essential for the event's operation.

This temporary order is essential to ensure the smooth running of the event and the safety of all involved. Alternative routes will be clearly signposted to minimize disruption.

Plan Ahead: Motorists are advised to plan alternative routes and allow extra travel time. Stay tuned to local traffic updates for real-time information.

For more details, contact the Scottish Government or visit their website.